Source Hydro Experts for your Project, Phone Consult or Job

Submit an anonymous Inquiry -- Start receiving responses within a few hours

Have a need? Explain it here

Zintro does not display, sell or trade e-mail addresses

An eye iconForgot password?
Submit Inquiry

By clicking Submit Inquiry you agree to our TermsVIEW

or Request a Demo

How Zintro Works

  1. 1. Provide a clear description of your needs and your expectations of an expert, consultant or job candidate and Zintro will match it with the most relevant professionals in our platform.
  2. 2. Within a day or two typically 6 - 12 Experts, who have opted-in, will contact you with a brief explanation of their qualifications and how they can help.
  3. 3. You can communicate back and forth, qualify each other, connect and pay fees to Experts through Zintro.
  4. Zintro is free, anonymous and without obligation.

Loved by Thousands

Loved by thousands logos

Need Help?A phone icon1-877-236-7016

Recent Hydro Inquiries

Area Icon

Hydro Power Plant

Hi im frankie. In trying to find out what size pelton wheel and how many buckets is best for my micro hydro plant. My head is 140.6 m and flow of 6lps. Using 1, 0.5 inch nozzle. Thanks frankie

  1. Profile Picture

    V B |V P - Business Development

    Size of Pelton wheel and nos of bucket are part of turbine design. Which is ***** at DPR ...

    14.9 Hours Later
  2. Profile Picture

    New |

    Dear Frankie, Power formula: Horsepower = Flow x head/8.81 and conversion to Kw is Horsepower x .7...

    23.5 Hours Later
+2 Other Responses
Area Icon

Hydro Power

Dear sir/madam, we are hydro turbine and generator manufacturers from 200kw to 50 mw single unit capacity. And currently working in india, nepal, china, vietnam, srilanka etc. Mainly asia. Now we are planning to expand our presence, for that we are looking strong local partners who can act as our representatives, agents etc. And work on project to project commission basis (commission can be discussed). If you are interested to work together with us based on above conditions we can discuss in detail, how to start our cooperation. Best regards rehan jafri

  1. Profile Picture

    Ibiela |Gas Turbine Technical Advisor

    Hello Rehan, I am interested in your proposal, and I look forward to further discussion on the mat...

    11 Minutes Later
  2. Profile Picture

    Ignacio |Partner

    Dear Sirs: I'm very interested. I've lead an hydropower supplier during many years. I know a lot the...

    1 Hour Later
  3. Profile Picture

    Emil |CEO, inventor, manager, contractor

    and who supports the costs of the *****ng the *****ods?...

    2.9 Hours Later
+9 Other Responses
Area Icon

Small Hydro

My company has identified a number of sites in ireland which we think are suitable for small <1m 'run of the river' hydro projects. We have been assessing the sites using publicly available data for estimated flow duration curves and head. We have been using rettscreen to estimate the output from the proposed generators. We would like to get some outside opinion on a) the acuracy of rettscreen and where it might over/underestimate output b) industry best practice in terms of flow measuring, and output calculations. We are egar to avoid a situation where a years worth of flow measurments will not pass the due diligance undertaken by banks c) advice on project managment and taking the project forward. Would like to hear from people with project assessment, pland design and project managment expirence of small hydro projects

  1. Profile Picture

    Jonathan |Consultant

    I have a large amount of experiance with run of river systems (low head), i have designed and manage...

    20 Minutes Later
  2. Profile Picture

    Mark |Owner

    My prior small hydro experience includes the Bradley Lake hydro project near Homer, Alaska. I was in...

    1.6 Days Later
+2 Other Responses
Area Icon

Turbine Hydro Generator

I am looking for someone who can assist me in the design of a turbine hydro generator of approx. 150 kw to be placed as a submersible generator in the stream.

  1. Profile Picture

    Behzad |VP of Technology

    I have consulted on a similar project for one of the oil majors in Houston which had funded such a t...

    34 Minutes Later
  2. Profile Picture

    Alessandro |Research Fellow

    Could you give me some additional detail on the turbine you would like to desing? Which working prin...

    37 Minutes Later
  3. Profile Picture

    Richard |Senior Engineer

    I can assist in answering any questions about your design. Advance drawings/concepts prior to the c...

    40 Minutes Later
+14 Other Responses
Area Icon

Hydro Power Plant

Hi, i want to build a micro hydro plant. Im able to produce a constant 65 psi. Can i estimate my output knowing just the psi? Thanks, frankie

  1. Profile Picture

    Emmanuel |Electrical Engineer

    You need to consider some points: 1) Is the *****unt you have firm energy, say, it will be avai...

    1.4 Hours Later
  2. Profile Picture

    ELGHI E. |CHIEF ENGINEER/ ENGINEERING MANAGER

    hi, In your question below input of H=65 psi (~ 45 m WC) is ***** the pressure. The second ...

    1.9 Hours Later
  3. Profile Picture

    Karol |Business development specialist, Project

    Do you know at least the ***** (squaremeters of ***** second)? Karol...

    4.3 Hours Later
+14 Other Responses
Area Icon

Pumped Hydro Energy Storage

We need a pumped hydro energy storage expert with experience in western us or western canada.

  1. Profile Picture

    AMARJIT |Zintro Expert

    Pl contact on my Canada Cell no. *****...

    7.1 Hours Later
  2. Profile Picture

    Ignacio |Partner

    Dear Sirs, I'm interested to support to you in this kind of projects. I'm experienced in large turbi...

    13.6 Hours Later
  3. Profile Picture

    Subramaniam |Chief Scientist

    We developed a new class Dam less hydro power technology wherein which dam / barrage construction is...

    1.9 Days Later
+6 Other Responses
Area Icon

Hydroelectric Power

Dear sir, i am a writing on behalf of ****a new business enterprise interested in the development of mini hydroelectric power in nigeria. Presently, there are no reliable data on small rivers and streams in the nigeria for accurately determining hydro electric power potential for shp in the country. I wish to develop the foregoing as a privately sponsored project work and it will form a preliminary document to cover about ‎300  small rivers and streams in nigeria. However, i need a competent technical advisor, that is why i am writing to request for details of how to get the support of your organization or better to discuss opportunity of being our technical partner. I will appreciate a response from you. Thanks. Yours truly, olumide

  1. Profile Picture

    Yasas |Professional Electrical Engineer

    Dear Olumide, Thank you for the inquiry. I think I can help you with to get the work started. I hav...

    4.2 Hours Later
  2. Profile Picture

    Deepak |Senior Mechanical Specialist

    HI, I have executed small hydro plants from 2.5 MW to 15 MW in the Himalayas, in norther part of in...

    12.3 Hours Later
  3. Profile Picture

    RAUL |Consultant

    I'm interested in looking at possible collaboration. I live in Europe and I've experience in Africa...

    15.7 Days Later
+5 Other Responses
Area Icon

Hydro Energy

We are looking for a hydro energy expert with at least 15 years experience in africa to assist with the following 1) phase 1 - development of a strategic plan. 2) phase 2 – development of department level operational or action plans that link to the strategic plan. 3) phase 3 – develop a process and format to provide a companywide annual report to board of directors executive management and staff; and to update the plan as needed to include various elements (tbc). Further information on the scope of work involved will be disclosed to qualifying candidates.

  1. Profile Picture

    Stefano |Infrastructure Project Consultant (Emerg

    Dear Sir / Madam, I have been working exclusively on the African energy sector for the past five ye...

    4.9 Hours Later
  2. Profile Picture

    Jens |Director of Business Development

    I have presented several projects to governments in countries like Ghana, Namibia, Nigeria and Angol...

    5.2 Hours Later
  3. Profile Picture

    Mark |Managing Director

    Dear staff, Our firm Aldwych Capital Partners is a merchant bank focused primarily on Sub-Saharan A...

    7.3 Hours Later
+9 Other Responses
Area Icon

Hydro Power

Hydro power project 40mw in india to be installed on bot basis for govt.On 40 years agreement,investment @80m usd,payback period 5yrs.

  1. Profile Picture

    Andrew |Director of Energy Storage Consulting Li

    Hello, We at ESCL can help you. Energy Storage Consulting Limited specialise in this sort of proj...

    2.4 Hours Later
  2. Profile Picture

    Gyanendra |Associate Vice President

    Hi I can help you with this as I have worked on ***** hydropower projects from various p...

    1 Day Later
  3. Profile Picture

    Greg |CEO

    I am interested in your project. Please contact me at your convenience. Greg...

    9.1 Days Later
+4 Other Responses
Area Icon

Hydro Power Plant

We are an ipp based out of hyderabad in india. Most part (250mw ) of our hydro portfolio is from assets acquired from developers, consisting of small (5mw) & medium (25 mw) hydro turbines. We are looking for a technical and operations consultant who can prescribe the best automation /scada and other systems that are either absent or dysfunctional in the present state. Please recommend a few consultants along with their contact details for us to pursue. Thanks,

    +undefined Other Responses
    Area Icon

    Hydro Powers

    I want to start a hydro power plant. I want to know how to go about it.

    1. Profile Picture

      Hans |Senior Consultant

      Thanks for contacting me. I might be able to help you, as I am doing hydropower consultancy and have...

      52 Minutes Later
    2. Profile Picture

      Ali |Senior Hydraulic / water Engineer

      Hi, do you the basic *****h is topography map and rainfall/runoff ***** you do I can ...

      3.3 Hours Later
    3. Profile Picture

      Tom |maintenance manager

      What size? What capital? *****ly? There is so much to consider. e.g. Are you talking about dome...

      2.9 Days Later
    +7 Other Responses
    Area Icon

    Hydro Turbine

    I need a consultant on hydro power, with knowledge of the supply chain for turbines, who speak either german and english.

    1. Profile Picture

      K.S. |Proprietor

      Worked in HYDELPOWER **********3yrs in system studies...

      6.3 Hours Later
    2. Profile Picture

      Mehdy |Electrical Engineer

      Hi Thanks for your email, but actually should be clarify place and annual income for this position. ...

      7.9 Hours Later
    3. Profile Picture

      Emil |CEO, inventor, manager, contractor

      I can supply you such an expert if your ***** fair. Doable, but is a lot of work involved in it,...

      87.6 Days Later
    +4 Other Responses
    See More Inquiries

    Top Hydro Experts

    See More Experts
    Share
    LinkedInTwitterFacebookGoogle+